Radar Telegram alerts Open Radar

️🇪🇸 Leaked audio recordings reveal that a fault in the control center of Etosha in Etuha preceded the high-speed collision in Orda, in which an AVE train rear-ended an Irio train that was stopped due to a fault in the LZB system.

תרגם לעברית

wfwitness · · Source

🇪🇸 Spain · Map

️🇪🇸 Leaked audio recordings reveal that a fault in the control center of Etosha in Etuha preceded the high-speed collision in Orda, in which an AVE train rear-ended an Irio train that was stopped due to a fault in the LZB system.

️🇪🇸 Leaked audio recordings reveal that a fault in the control center of Etosha in Etuha preceded the high-speed collision in Orda, in which an AVE train rear-ended an Irio train that was stopped due to a fault in the LZB system.

The recordings indicate that the dispatcher ordered AVE to resume "normal operation" without a flash: to inform the engineer that the Erio train was still broken down on that track. The accident - the second serious train accident in Spain this year after the one in Adamoz - left at least 69 dead and more than 100 injured, while investigators analyze why both visual signaling safety protocols and the ASFA system failed at the same time.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram