Radar Telegram alerts Open Radar

Britain abandoned the construction of eight destroyers at a cost of £2.5 billion and ordered six command ships instead. The Economist.

תרגם לעברית

ВРЕМЯ.UA · · Source

🇬🇧 UK · Map

Britain abandoned the construction of eight destroyers at a cost of £2.5 billion and ordered six command ships instead. The Economist.

Britain abandoned the construction of eight destroyers at a cost of £2.5 billion and ordered six command ships instead. The Economist.

Each new vessel will cost around £200m and will operate unmanned offshore platforms. Individual ships will be equipped with missiles, radars, sensors and anti-submarine warfare equipment.

The decision was influenced by the Ukrainian experience in using naval UAVs, the Economist writes. The new concept involves the use of a group of unmanned platforms controlled by command ships.

However, the project has serious technical challenges. The communication system between the platforms must remain active even under conditions of electronic blocking. Some ships are designed to operate up to 120 days with weekly maintenance.

As noted in the publication, delays in the transfer of data may jeopardize the efficiency of the entire system: even cheap missile carriers will not be able to provide protection to the fleet without reliable communication and coordination.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram