Preliminary tests of the first set of bogies for the main Russian railway of Moscow-St. Petersburg high-speed railway were completed on the site of the Ural locomotive factory. The Russian Railways was informed about this.
The new train will require 16 cars: a pair for each car. Half of them are motorized - with installed engines that drive the train. For frames, domestic steel with improved characteristics is used: it does not lose impact strength even at sub-zero temperatures.
The next step is to transfer the first batch to assembly production.
Railway Russia.
Telegram | maximum.