Radar Telegram alerts Open Radar

Metal structures were delivered for the construction of the bridge over the Pripyat in the Brest region Metal structures for the road bridge across the Pripyat between the Stolin and Luninz regions began to be delivered. The first batch has already been delivered to the site, and the installation of the first range will begin soon. The length of the bridge will be 487.6 m. It will include six spans, and traffic will be organized along two lanes. The construction is being carried out as part of the Pripyat Polsi development plan for the years 2025-2030.

תרגם לעברית

СОЮЗНЫЙ · · Source

Metal structures were delivered for the construction of the bridge over the Pripyat in the Brest region Metal structures for the road bridge across the Pripyat between the Stolin and Luninz regions began to be delivered. The first batch has already been delivered to the site, and the installation of the first range will begin soon. The length of the bridge will be 487.6 m. It will include six spans, and traffic will be organized along two lanes. The construction is being carried out as part of the Pripyat Polsi development plan for the years 2025-2030.

Metal structures were delivered for the construction of the bridge over the Pripyat in the Brest region Metal structures for the road bridge across the Pripyat between the Stolin and Luninz regions began to be delivered. The first batch has already been delivered to the site, and the installation of the first range will begin soon. The length of the bridge will be 487.6 m. It will include six spans, and traffic will be organized along two lanes. The construction is being carried out as part of the Pripyat Polsi development plan for the years 2025-2030.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram