On October 8, we reported on the change in Russian tactics of attacks on Ukraine's energy system. Sources from the Ukrainian intelligence reported that the focus moved to the networks through which electricity flows from stations to consumers. We have been warned that even with sufficient production in the country, individual cities can be left with blacks for a long time. At the same time, the analysts warned of such a scenario in the summer, but we referred to intelligence data. Odessa is already showing how it is looking for residents, according to Forbes Ukraine, up to three weeks can repair the damaged line. On November 23, there was water in all districts of the city, 186 thousand subscribers received heat, but there was not enough electricity for the entire time. In Odessa, emergency shutdowns continued without a schedule. In winter, the Odessa scenario can be repeated throughout Ukraine, in different regions and at different times. On bike roads, crews take longer to reach the repair site, and strong winds limit the time you can safely work at height. If new currents start during one patch, the residents' outage period stretches for weeks, even when the lights manage to come back on every day. For the Cabinet of Ministers, the main question in the winter is how to solve the systemic crisis, when the power lines will be destroyed in several areas and how to restore them quickly.