Radar Telegram alerts Open Radar

The first cars for the high-speed train were produced.

תרגם לעברית

MASHNEWS · · Source

🇷🇺 Russia · Map

The first cars for the high-speed train were produced.

The first cars for the high-speed train were produced.

The Ural Locomotive Plant has completed the production of the first batch of motor and non-motor bogies for the Russian high-speed railway. These are the main components of the running equipment of future high-speed trains.

The bogies are now undergoing preliminary tests before being installed under the cars. At the same time, the assembly of the first two trains continues: all 16 cars have already been welded and painted, and the installation of electrical equipment and current collectors is underway. A headliner and automatic clutch are also installed.

After the completion of assembly and the necessary preparatory work, it is planned to send the first high-speed train for testing in 2027. This step will allow testing the operation of the systems and the main train components under conditions similar to future operation on a high-speed line.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram