In Kozbes, they plan to test a garbage truck on LNG, in Bratsk there were obstacles in coordinating the location of small-scale production. Kuzbassrazrezugol plans to start pilot-industrial tests of a diesel truck of the 55W gas diesel oil with a carrying capacity of 130 tons. The car passed tests at the factory and was sent to Cozvas. It is equipped with a cryogenic LNG tank of 1,400 liters and a diesel tank of 1,900 liters. Autonomy of work has been declared up to 12 hours. The trials are expected to begin in December 2026, and will last two years. Interfax in Bratsk, the environmental prosecutor's office opposed the approval of the location of small-scale LNG production in the Right-Bank district of the city. The project provides for the cap of gas from the Bratskoye field on a compact facility. At a Douma city meeting on November 27, the prosecutor's office pointed out the inconsistency of the sanitary protection zone with the legislative requirements: the documentation contains 300 meters instead of the 1,000 meters required by the supervisory authority. This may lead to the postponement of the execution date, but the final cancellation of the project has not been confirmed. TC city.