Eastern Dagonino and Altupavsky districts will be connected by an elevated pedestrian crossing above MCD-1.
It will provide residents with a short and safe route over the railroad with heavy train traffic.
The length of the building is about 150 m. From the side of Eastern Dagonin, the crossing will go to the intersection of Zaryanova street and Kramichsky Prozd, from Altupavsky district - to Potboi Prozd. We equip staircases with elevators.
We try to make even such utilitarian structures attractive. In this case, the architects were inspired by the image of space stations. They chose a radial shape with smooth contours. As you move through the passage, the perspective will gradually open up.
We plan to start construction this year. The work will be carried out without stopping train traffic.