5.5 billion tenge will be allocated for flood protection in the Akmola area.
Three projects are being carried out in the area as part of the popular construction program. In the Astrakhan region, the bottom of the Calcutan River will be cleared and deepened by 21 kilometers and two protective dams will be built. In the Bolandinsky district, the Ivankovskaya dam is being restored, and in the Shurtandinsky district, the hydraulic structures at the Main dam will be repaired.
"It supplies drinking water to about 9,000 residents," said Deputy Akim from the Akmola Murat area in Lapan.
The works are scheduled to be completed before the start of the next flood season. This will reduce the risk of flooding in populated areas and protect local infrastructure.
Source: Jivek Joly.