The beginning of the drilling operation of Line 9 of the Tehran Metro with a length of 53 km and 38 stations.
The excavation of line 9 of the metro in Tehran, as the longest metro line in the capital, with a length of 53 km and 38 stations, began today (Tuesday) simultaneously from two points of Daulat Abad and Chitgar; a project that, according to the deputy mayor of Tehran, this line is one of the most important and longest lines being constructed and built in Western Asia.