Tajikistan plans to build the Khutalon hydroelectric power plant with a capacity of 800 MW
Tajikistan is planning to build a hydroelectric power plant (HPP) "Khotlon" ("Shurov") on the Vashkh River with an installed capacity of 800 MW, the press service of the Ministry of Energy and Water Resources of the republic reported.