The government is discussing a bill to amend the city planning law. The bill provides for the possibility of starting preparatory work in the area of the production area before obtaining a building permit. The measure will shorten the construction and rebuilding time of buildings, as well as reduce business costs. Companies will be able to conduct engineering and geodetic surveys, create a construction camp and temporary infrastructure immediately after sending the design documentation of the facility for inspection. The main condition is the absence of a dangerous production situation and compliance with environmental requirements. The president noted that the work to eliminate administrative barriers and excessive demands is extremely important and must be continued, stressed Mikhail Meshustin.