The SOC Sevastopol stadium was prepared for League B games.
The reconstruction of the soccer field there is now being completed.
The new grass has already been mowed for the first time and irrigation, drainage and heating systems have been installed in the area. The benches were expanded from 16 to 24 seats.
The works are planned to be completed by the end of 2026.
The stadium is being renovated before FC Sevastopol plays in the second division A, silver group. In some way a historical event.
ForPost / ForPost.