In Mariupol, the second building of the school that was destroyed in 2022 was restored, the roof was completely replaced, the facade was insulated and catering equipment was installed. Interior decoration is underway, drawings have been placed on the walls. The contractor also took care of security: the facility was equipped with fire and security alarms, video surveillance, turnstiles and metal detectors. The renovation is carried out by the regional commander of the Moscow region. Read more video: Oleg Trofimov's tg channel.