Radar Telegram alerts Open Radar

Norilsk has mastered a new road repair technology: fewer millimeters, the same millions.

תרגם לעברית

Borisenko Dmitriy · · Source

Norilsk has mastered a new road repair technology: fewer millimeters, the same millions.

The municipal institution Norilskavtodor entered into a contract with the DTK Yamal company for the repair of the Norilsk-Alikal road worth 26.3 million rubles.

However, as local social activists discovered, instead of the 8 mm bitumen-polymer film specified in the contract, the contractor used 5 mm.

But that's not all. The tape was produced in 2020 with a shelf life of only 12 months. It turns out that before it was used it was about five years late.

Community activists found similar violations in five other road contracts totaling approximately 412 million rubles. Traces of the use of expired material were found in nearly two dozen municipal contracts.

Social activists turned to the prosecutor's office.

It's an amazing thing: in the conditions of the far north, where increased demands are placed on the quality of the road surface, they manage to save even three millimeters of connecting tape.

Apparently, to fix the roads again next spring. After all, budget money, unlike bitumen tape, tends to be renewed every year.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram