The tunnel between Russia and the USA will cost 16.7 trillion rubles. Analysts have estimated the cost of an underwater passage through the Bering Strait at $205 billion. The main problem is the lack of railroads in Chukotka and the necessary routes in Alaska. They will have to be built from scratch. Even in a realistic scenario, the project will only end in 2041.