Radar Telegram alerts Open Radar

The Director of Communications at the Ministry of Energy told SANA: After the repair of the designated line, work is currently underway to restart it and pump the material through it, in preparation for its arrival at the Humus warehouses and the resumption of loading operations from them as soon as the required quantities are available, which will contribute to relieving the pressure on Banias and increasing the flow of supplies.

https://t.me/WikileakRobot · Source

The Director of Communications at the Ministry of Energy told SANA: After the repair of the designated line, work is currently underway to restart it and pump the material through it, in preparation for its arrival at the Humus warehouses and the resumption of loading operations from them as soon as the required quantities are available, which will contribute to relieving the pressure on Banias and increasing the flow of supplies.

Sana

Share on WhatsApp Get alerts on Telegram