The Ministry of Emergency Situations continues to implement the plan to restore the Al-Sikha Dam and the course of the Kwik River to reduce the risk of flooding.
Details:
The teams of the Ministry of Emergencies and Disaster Management continue to implement an emergency and initiative plan for the restoration and strengthening of the Al-Seyha dirt dam and the restoration of the waterways within the Kwaik river basin, in cooperation with the Ministries of Energy and Agriculture and the provinces of Aleppo and Idlib.
The program aims to reduce the risks of flooding and flooding, protect agricultural land and essential facilities, improve water drainage efficiency and increase preparedness during the rainy season.
The plan includes strengthening and restoring the dirt strips surrounding the dam with a total length of 50 km, at a completion rate of over 65%, in addition to stabilizing them and covering them with protective shields to reduce the impact of waves and erosion factors.
The works also include the restoration and implementation of 10 water ferries, the restoration of agricultural roads 12 km long and in addition the isolation of the route of Nahal Quick and its branches with a total length of up to 200 km.
The completion rate for the work of isolating waterways has so far reached 37%, which contributes to improving the flow of water, reducing the risks of accumulation and flooding, and increasing the protection of agricultural areas and essential facilities.