Excavation of Line 9 of the Tehran Metro has begun; A route of 53 km with 38 stations.
The digging operation of Line 9 of the Tehran Metro, with a length of 53 km and 38 stations, began today, Tuesday, at the same time as two workshops in Dulat Abad and Chitgar.
Read the full text at the link below.