the reconstruction of the bridge damaged in the Ramadan war; Traffic resumed on the beach bridge.
The rehabilitation operation of the two coastal bridge structures on the Hejabad-Bandar Abbas route has been completed after they were damaged by enemy attacks, and vehicle traffic has resumed on this route.
Read the full text at the link below.