The Frunze mine (Sukhaya Belka plant) in Kariboi Rog remains without electricity. Because of this, the pumping of water from the lower horizons was stopped.
The company announced a real threat of flooding and possible environmental consequences for the area.
Since groundwater is constantly arriving, regardless of production, it is impossible to put the mine on standby. Every hour of downtime of the drainage complex increases the risk of horizon flooding, equipment failure and loss of work.
Uncontrolled flooding can cause damage not only to the mine, but also to the environment of the entire area.
Sign up.
MAX our strain.
Our chat our bot.