Nitzan Shapira
The engineering forces of the Ephraim Brigade this morning sealed the two shafts that were located in Kalkilia last month. The shafts were finally sealed by pouring concrete, after being initially sealed after they were located. These are two shafts with an entrance opening without an exit opening and the proximity of the shaft to the seam area was ruled out.