Radar Telegram alerts Open Radar

Krasnolochsky branch.

תרגם לעברית

Красный Луч ЛЕНТА НОВОСТЕЙ И ОБСУЖДЕНИЙ · · Source

Krasnolochsky branch.

Krasnolochsky branch.

continues to carry out work to repair service lines.

One of the most important components in the equipment of an apartment building is the drainage system, therefore the replacement of drainage pipes plays a central role in ensuring the living comfort of the tenants.

The image shows the process and result of the work done at the addresses listed below.

Krasni Loch, micro-district 3, building 10 - work has been completed to replace pipes in the basement and to replace the rise from the 1st floor apartment to the basement.

At the address: Krasni Loch, district 3, building 11, the cast iron drain towel in the apartments was replaced with a new plastic one.

At the address: Krasni Loch, microdistrict 3, building 2, a partial replacement of the drainage pipe in the basement was carried out - 4 MP pipes were replaced.

At the address: Krasni Loch, block 383 of the miners' wing, building 1, the drainage pipes in the basement were also replaced.

The work is carried out according to residents' requests and according to the latest repair plan.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram