Radar Telegram alerts Open Radar

Repair and restoration work continues in the republic after a hydroelectric power strike on energy infrastructure facilities.

תרגם לעברית

Красный Луч ЛЕНТА НОВОСТЕЙ И ОБСУЖДЕНИЙ · · Source

Repair and restoration work continues in the republic after a hydroelectric power strike on energy infrastructure facilities.

The Ministry of Fuel and Energy of the LPR stated that in order to carry out the necessary works, temporary power outages are being activated in all municipalities.

All these measures are necessary to restore damaged equipment and stabilize the operation of the energy system.

We ask the residents to treat the situation with understanding and, if possible, to reduce the load on the electricity grid:

Do not operate several powerful electrical devices at the same time;.

Limit the use of energy-intensive household appliances.

Energy workers continue to work intensively to restore power supply to consumers as soon as possible.

The progress of the restoration works is under the control of the head of the LPR, the government of the LPR and the Ministry of Fuel and Energy of the region.

The LPR Govt.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram