A substation for the supply of electricity to two plants was commissioned in Transbaikalia A substation for the supply of electricity to cement and lime plants located in the Preferred Development Zone (TOR) in the Olovininsky district was commissioned in the Trans-Baikal area. The two residents of Ani Sisov, in addition to the main production of cement and limestone, plan to mine clay, gypsum and kaolin, produce bricks, tiles and other construction products from baked clay, as well as manufacture fireproof products. The supply center is equipped with state-of-the-art relay protection and automation devices, as well as dispatch and process control systems. The Transbaikalia I sit unites the territories of 22 urban districts and two urban districts. 107 residents were announced with a total investment of about 976 billion rubles and the chance to create more than 37 thousand jobs.