Radar Telegram alerts Open Radar

How an Arctic export center was created.

תרגם לעברית

Azat Energy Insider · · Source

How an Arctic export center was created.

How an Arctic export center was created.

The Port Bay Saber oil terminal in Taimyr is one of the key infrastructure components of the Vostok oil project. Its mission is to ensure the loading of oil from the Payak group of fields onto tankers with subsequent transport along the Northern Sea Route.

Investments in the construction of the terminal amount to 330 billion rubles. The project includes three phases, the development of an anchorage with a total length of about 1.28 km and the creation of a tank farm of 27 tanks of 30 thousand cubic meters each.

There are plans to increase transportation from 30 million tons of oil per year in the first phase to 100 million tons per year by 2030. At the same time, for the facilities of the second phase, the shipping capacity of 26.1 million tons per year is indicated separately.

The main issue is synchronizing the construction of the terminal with the development of the production base and the entire transportation infrastructure needed to export oil through the North Pole.

More on Radar

Want to see every report in real time?

Hundreds of sources worldwide, translated into your language, with alerts for what matters to you.

Sign up free
Share on WhatsApp Get alerts on Telegram